CASE STUDY 01
INVAMAX FOS | Productivity Improvement | 2022–2025

42.3% Productivity Increase at Pencil Factory

From 742 to 1,056 UPH after 4 years of continuous operating system improvement.

+42.3%
Labor Productivity
1,056
UPH (Units/Labor/Hour)
4 Years
Continuous Improvement
Productivity (UPH)

The Problem

At a pencil manufacturing plant, productivity is not only limited by the workers' speed but also by multiple factors in the operating system: management structure, resource allocation, lost time during shifts, bottlenecks between stages, layout, and production flow.

Therefore, the goal is not to demand workers to work faster, but to:

"Eliminate factors that make one labor hour generate less value than the system's actual capacity."

System Improvement Over Task Improvement

01

Production
Organization

Reorganize stage management and increase resource coordination capacity.

02

Manpower &
Capacity

Measure actual productivity, control labor hours and deploy personnel based on demand.

03

Flow

Improve layout, resolve bottlenecks and shorten the production flow.

04

Waste
Elimination

Reduce waiting, transportation, motion and non-value-adding tasks.

05

Standard &
Kaizen

Standardize effective solutions and replicate them across other stages.

06

Digital

Digitize shop-floor production data to support Daily Management.

742 1,056 UPH

+42.3% direct labor productivity

2022
742 UPH
2023
860 UPH
2024
937 UPH
2025
1,056 UPH

The result does not come from a single Kaizen event, but from a continuous process of improving organization, manpower utilization, flow, work standards, and operational data (2022–2025).

“Increasing productivity doesn't mean making people run faster.
It means making the operating system run lighter.”

Talk to INVAMAX